Content of Interest
- 08/11/2021in Automation-Eng, Security
For MQTT Protocol, You Can Install Your System Easier With IOTRouter ZHC4922!
ZHC4922 is an industrial 4G RTU, providing 4 DI, 4 DO, 4 AI, and 1 RS485 interface. It supports local logic processing operations, automatic acquisition and active reporting, MQTT RTU/TCP adaptation, automatic calibration threshold reporting, Configuration software docking, dry and wet node IO detection and other features. Basic Informations : Chip... - 01/10/2025in Automation-Eng, Security
Bring Flexibility To Your Facility With Hitachi Codesys-Supported Compact PLC’s.
In your facility, instead of locally operated contactors and time-delay relays in old-technology mechanical panels, new-generation Codesys-based compact PLC products tailored to your needs can bring practicality to your operations. With these products, your revised panel will gain a communication infrastructure. Depending on your requirements, you ... - 28/01/2021in Automation-Eng, Security
Hitachi HX Series IOT Supported PAC Controller
Hitachi HX Series PAC(process automation controller) is the next generation industrial controller. With the Hitachi HX PAC controller, it offers perfect control for all kinds of industries, from machine automation to system automation. Thanks to its IOT capabilities, it is ready for the next generation requirements in automation. With its 1ns proce... - 02/03/2022in Security
As Cedetaş Inc. we are proud of completing one of our abroad projects. Al-Zahra University Faculty of Medicine and Pharmacy
As Cedetaş Inc. we are proud of completing one of our abroad projects. Al-Zahra University Faculty of Medicine and Pharmacy Alzahra University Faculty of Medicine and Pharmacy is one of the largest universities in the Karbala/Iraq region. The university, which has a closed area of 65,000 square meters, consists of 1 main education building, 3... - 24/06/2021in Automation-Eng, Security
Iraq Mass-Qaiwan Water Supply To Industrial Facilities Project
All electrical works of 3 pumping stations, 1 treatment plant and 15000 m3 warehouse built to meet the water needs of 4 different industrial facilities in the IRAQ Organized Industrial Zone, supply of 6.3 kV MV softstarters (Softstarter), assembly, commissioning and automation SCADA works were done by Cedetas Engineering. In project scope; At the 1...





