PROJECT DESCRIPTION:

The water treatment plant is designed fully automatic. All pumps used in the plant are 100% redundant. Demineralized water plant operating data can be monitored via scada display and power plant general control panels.

The turnkey automation system of the Well Water Demineralization Plant was established. In the power plant with an installed capacity of 39 MW, demineralized water is produced which the high pressure steam turbine needs.

In project scope :

  • 1 x 80 m3 / h - Fully Automatic Multilayer Sand Filter
  • 2 x 25 m3 / h erse Reverse Osmosis (80% Yield)
  • 50 m3 / hour – Degasser Unit
  • 40 m3 / h I Mixed Bed Deionization (MBDI-Tandem)
  • 35 m3 / h / Mixed for Condensate Treatment
  • Bed Deionization (CPMBDI - Tandem)
  • Demineralized water plant;
    - Crude water chlorination
    - Fully automatic multilayer sand filters
    - 3 Reverse Osmosis Units with 80% efficiency
    - degasser unit,
    - fully automatic and tandem mixed-bed deionization unit
    - Chemical regeneration
    - Neutralization units
    - It consists of mixed bed deionization unit.