What is Motor Test Stand Application? – Cedetaş Mühendislik ve Teknoloji A.Ş

Cedetaş Mühendislik ve Teknoloji A.Ş

  • About Us
  • Services
    • Industrial Automation
    • Life Safety Systems
    • Energy Solution Services
    • Project Design and Consultancy
  • Fields of Activity
    • Industrial Automation
    • Life Safety Systems
    • Project Design and Consultancy
    • Energy Systems
  • Products
    • Industrial Automation
    • Life Safety Systems
    • Project Design and Consultancy
    • Energy Systems
  • References
  • Blog
  • Contact Us
  • TR
Online Satış
Tuesday, 12 October 2021 / Published in Automation-Eng, Security

What is Motor Test Stand Application?

The motor, whose production process is completed, needs to pass some tests before it reaches the end user. It is possible to collect the tests to be done under 3 Phases.

Phase-1 :

After starting the motor; current, voltage, frequency and vibration values are read. If the readings meet the specified standard values, the motor has passed these tests successfully. These tests are done while the motor is running.

Meger measurement should be made after the motor has stopped. If the value read is within the set value range, the motor has passed the meger test.

 

Phase-2 :

The motor, whose current, voltage, frequency, vibration and meger test processes are completed, enters the pressure (leakage) test. The motor must be de-energized for the pressure test. For pressure testing, water or air is supplied to the motor through a valve. When the pressure in the motor reaches the set level, the flow is cut off with the help of the valve. There should be no drop in water or air pressure during the specified time. If there is no decrease in pressure value, the motor has passed the pressure test.

 

Phase-3 :

The motor, which passes the tests in the first two stages, is taken to the block rotor test. The purpose of the block rotor test is to observe the change in current values by applying low voltage to the motor. For the block rotor test, the motor rotor is locked with a mechanical part. A voltage lower than the nameplate value is applied to the motor. If the variation between the measured current values is at an acceptable level, the motor has passed the block rotor test.

Motor test SCADA Architecture can be expressed as follows;

All values read can be monitored with a SCADA software. Following up with a visual like the one below will provide a controlled and useful test follow-up. Thus, all data will be seen on a single screen, tracking and intervention will be possible.

Moving the data to the report environment will also be important in terms of making historical-based analyzes.

For similar needs, you can reach us from our phone numbers or our website www.cedetas.com.tr.

Loading

Recent Posts

  • Advantages of the OG Soft Starter Compared to an Auto Transformer

    Asynchronous motors draw up to approximately 8 ...
  • Thyristor-Based Heat Control System

    The German-made IGEL TSE product is a powerful ...
  • The Stone Crushing Machine Is Started with a Soft Starter.

    At the chrome mining plant, medium-voltage soft...
  • Application of Soft Starters to Medium Voltage Compressor Motors In a Polyester Fiber Production Facility

    Polyester – Medium voltage soft starters were s...
  • Bring Flexibility To Your Facility With Hitachi Codesys-Supported Compact PLC’s.

    In your facility, instead of locally operated c...
Type in your search word and press "enter" ...

Fields of Activity

  • Industrial Automation
  • Life Safety Systems
  • Project Design and Consultancy
  • Energy Systems

Products and Solutions

  • Industrial Automation
  • Life Safety Systems
  • Project Design and Consultancy
  • Energy Systems

Email Subscription

Cedetaş Engineering and Technology, Inc.  Share your e-mail address with us in order to receive timely updates about our developments.

Made with by tbtcreative.com © 2020 cedetas.com.tr All rights reserved.

TOP

We are using cookies to give you the best experience on our website.

You can find out more about which cookies we are using or switch them off in .

Cedetaş Mühendislik ve Teknoloji A.Ş
Powered by  GDPR Cookie Compliance
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

If you disable this cookie, we will not be able to save your preferences. This means that every time you visit this website you will need to enable or disable cookies again.